Interconnected modular production system
The system combines automated porosity inspection, blind rivet nut installation and leak testing in a single production process. A machine vision system reliably detects pores and casting defects in critical areas of the battery tray’s lower shell. The system then automatically installs 16 blind rivet nuts with integrated force–displacement monitoring.
A dual-station unit tests the battery tray frame for leaks. It first tests the tray interior using the pressure rise method, then tests the through-bolt locations using the pressure decay method. Specially designed displacement bodies substantially reduce the internal volume to be tested.
During the interior leak test, the test instrument’s fill monitoring function detects pinched or disconnected test lines and prevents false passes.
A central rework station reduces scrap and increases system availability. It includes a workstation for manual installation of the blind rivet nuts and allows operators to repeat the leak test under series production conditions using identical test equipment and fixturing. The station also includes an automatic leak detection function. Once the workpiece has been filled with forming gas, leaks can be pinpointed using the HLD 10.
The modular design allows the system to be easily integrated into existing production lines and provides the flexibility to accommodate future product variants and growing production requirements.
- Number of Assembled Components:PlusBox cover (2 variants), PlusBox carrier plate (2 variants), MinusBox cover (2 variants), MinusBox carrier plate (2 variants), AUX fuse (3 variants), Pyrofuse fuse (2 variants), Shunt sensor (2 variants), Relay (2 variants), Control unit, PlusBox GapPad, MinusBox GapPad, PlusBox insulation film, Minusbox insulation film
- Variant Diversity/Complexity:The boxes can be built in all variants requested by the customer.
- Workpiece Transport:Workpiece with workpiece carrier on a recirculating pallet conveyor
- Cycle Time:39 sec.
- Number of Processes:Screw fastening of shunts, Pyrofuse and AUX fuses, Press-fitting the relays, Joining the covers to the carrier plates, Screw fastening of the relays, Applying insulation film, Inspecting insulation film using a camera with dome lighting, Pressing down the insulation film, Positioning and rolling down the GapPad, Laser marking the DMC code.
- Required Staffing:2 employees, 1 machine operator
- Inspected Parameters (Characteristics):4 automatic scanners, 3 cameras
- Control Technology and Data Transmission:7 PLCs, 6 robots, 1 host computer, 1 camera PC, 2 load cells






